144 Street Linear Park
This project saw the installation of an irrigation system and improved walkway.
-
25 MPH Zones
This project sought to perform a study to determine where speed limits can be reduced, gain approval for speed reduction from the County, and install new 25 MPH signs.
-
Center City Tree Planting
This project identified planting locations, gained necessary approvals, and completed the installation of 117 trees.
-
City Hall Improvements - Phase I
This project involved pressure cleaning the building's exterior and upgrading restroom facilities on the third and fourth floors.
-
Keystone & Sans Souci Gateway Feature Restoration
This project including the restoration of the walls gateway features, upgrading the signage, and re-landscaping the surrounding areas.
-
NE 12 Avenue Tree Planting
This project identified planting locations and gained the approval for tree installation.
-
North Bayshore Park Boardwalk
This project designed and permitted the boardwalk, removed invasive vegetation and reconstructed the boardwalk.
-
North Bayshore Park Dog Park & Perimeter Fence
This project relocated the dog park within the facility and replaced the deteriorated fence.
-
Potable Water Well Rehabilitation
This project included the cleaning and sanitation of eight water supply wells as well as inspecting and upgrading motors and pumps as necessary.
-
Roadway Resurfacing - Phase I
This project prioritized roadway resurfacing work based on existing study and completed work in each of the Council Districts.
-
Roadway Resurfacing - Phase II
This project sought to prioritize roadway resurfacing work based on existing study and complete work in each of the Council Districts.
-
Sans Souci Gated Community Street Closures
This project included the removal of four existing chain link closures, installation of 3 fence closures, two concrete block closures, and new landscaping.
-
Sans Souci Tennis Center Court Resurfacing
This project included the patching, sealing, and resurfacing of 12 tennis courts and replacement of deteriorated nets.
-
Sasso Pool Improvements
This project included replacing the deteriorated roof, upgrading the pump house equipment, and resurfacing and replacing the pool desk and furnishings.
-
Sidewalk Repair & Installation - Phase I
This project prioritized sidewalk repair work based on existing requests.