Bobby Hamer Field Renovations
The perimeter fence was replaced, new landscaping installed, and site furnishings were upgraded.
-
City Hall Improvements - First Floor
In 2017, common spaces in City Hall on the first and second floors were remodeled.
-
Community Tree Plantings
This project identified planting locations for trees in each neighborhood and then installed them in rights-of-way.
-
Keystone Park Playground Resurfacing
This project saw the repair of the sinking subsurface and replacing the pour-in-place surface with a turf surface.
-
NE 4 Avenue Streetscape Enhancements
This project included street resurfacing, on-street parking, drainage, sidewalk repairs, curb and gutter work along with landscaping.
-
NE 6 Avenue Water Main Replacement
This project sought to design the system to meet the needs of the community and replace two existing lines with one main line.
-
North Miami Public Library Exterior Enhancements
This project upgraded the security camera monitoring system, the irrigation system, and exterior lighting. It also installed outdoor furniture.
-
NW 7 Avenue Commercial Façade Program
This project targeted commercial business along the NW 7 Avenue corridor and entered into public-private partnerships to improve commercial façades.
-
Right-of-Way Condition Survey
This project performed an analysis of all City maintained streets and alleys constructed of asphalt and/or concrete and developed a priority list for future maintenance.
-
Roadway Resurfacing - 2017
This project sought to prioritize roadway resurfacing work based on existing study and complete work in each of the council districts.
-
Seaboard Acres Utility Rehabilitation
This project's scope included designing and permitting replacement of City utility lines, relocating utilities from bridge to under canal, and upgrading City utility lines within this area.
-
Sewer Pipe Lining
This project involved the inspection of sewer gravity mains and identify which mains are showing signs of excessive wear.
-
Sidewalk Repair and Installation - Phase II
This project prioritized sidewalk repair work based on existing requests and completed work in each of the Council Districts.
-
Traffic Calming Device Installation
The scope of this project sought to design and permit traffic calming solutions and seek resident and Council support for proposed projects.
-
Traffic Circles
This project entailed construction of traffic circles at 121 Street and NE 12 Avenue, and 133 Street and NW 11 Avenue.