SCOPE OF WORK
The force main improvement project consists of the replacement of the existing 18-inch diameter force main along NE 135 St, between Biscayne Boulevard and NE 16th Avenue, with approximately 2,000 linear feet of 18-inch diameter and 100 linear feet of 10-inch DR-18 PVC force main including associated fittings, connections and reconnections, roadway restoration, sidewalk restoration, and curb and gutter restoration, as directed by the City and/or Engineer
DEADLINE FOR ADDITIONAL INFORMATION & CLARIFICATION
Friday, October 1, 2021, by no later than 3:30PM (EST)
DEADLINE FOR SUBMITTAL OF BIDS
Friday, October 29, 2021, by no later than 3:30PM (EST)
NON-MANDATORY PRE-PROPOSAL CONFERENCE
Wednesday, September 22, 2021, at 10:00AM
Parking Lot
13400 Biscayne Blvd
North Miami, FL 33181